Victor Buyck Steel Construction Meulestedebrug
Belgium - 2025 - Bridges

Meulestedebrug

In progress

You are here

Description

Two new bridges will replace the existing movable bridge in Ghent and thus improve access to the north of Ghent.

Each bridge consists of 3 elements, of which 2 fixed parts and 1 central movable part. The movable part is a bascule bridge that provides a free passage of 20m for ships.

The bridge is 58m long in total, of which the road surface of the central movable part takes up about 25m. The bridges design consists of box-shaped main girders, I-shaped cross girders and an orthotropic deck.

All bridge components are manufactured in their entirety in the Wondelgem workshop and then transported to Ghent. The first bridge will be assembled in the summer of 2023, the second one will follow in the autumn of 2024.

Project type & location

Type: 
Bridges
Function: 
Movable road bridge
Country: 
Belgium
Location: 
Ghent
Project start date: 
Project finish date: 

Project specifics

Dimensions: 
58m x 18m + 58m x 15m (L x W)
Tonnage: 
2.400
Client(s): 
De Vlaamse Waterweg
General Contractor(s): 
TM Artes Depret - Victor Buyck Steel Construction - Besix Unitec
Steel Construction: 
Victor Buyck Steel Construction
Engineering: 
SBE

Media

Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug
Victor Buyck Steel Construction Meulestedebrug

Similar projects

Victor Buyck Steel Construction Middle Dock Bridge Canary Wharf Contractors
United Kingdom - 2025 - Bridges

Middle Dock Bridge

Victor Buyck Steel Construction HS2 A43 Brackley Overbridge
United Kingdom - 2025 - Bridges

HS2 A43 Brackely Bridge

See all projects