Description

Victor Buyck is building the steel structure of the new office building on 60-70 St. Mary Axe. This building will encompass an entire city block and is often referred to as “the can of ham”. The sobriquet derives from the special curved shape of the building, which was designed to not interfere with the existing views in Londen.

The structure appears as the top two-thirds of an ellipse, from which the center would be at Level 8.

The 90meter high tower is constructed in the shadow of the Gherkin, another Victor Buyck Realization.

The building will have 24-storeys that provide 26.000m² office and retail space.

Victor Buyck will aside from the structural steel also provide the metal deck and the steel stairs.

Project type & location

Type: 
Bridges
Category: 
Utility building
Function: 
Office building
Country: 
United Kingdom
Location: 
Londen
Project start date: 
Project finish date: 

Project specifics

Dimensions: 
50mx40mx91m (LxWxH)
Tonnage: 
2480 ton
Client(s): 
Mace Ltd.
General Contractor(s): 
Mace Ltd.
Steel Construction: 
Victor Buyck Steel Construction – Hollandia J.V.
Architect(s): 
Foggo Associates
Engineering: 
Foggo Associates
Victor Buyck Steel Construction 60 70 Saint St. Mary Axe Can Of Ham
Victor Buyck Steel Construction 60 70 Saint St. Mary Axe Can Of Ham
Victor Buyck Steel Construction 60 70 Saint St. Mary Axe Can Of Ham

Similar projects

Victor Buyck Steel Construction Middle Dock Bridge Canary Wharf Contractors
United Kingdom - 2025 - Bridges

Middle Dock Bridge

Victor Buyck Steel Construction HS2 A43 Brackley Overbridge
United Kingdom - 2025 - Bridges

HS2 A43 Brackely Bridge

See all projects